Project 21820E

Project 21820E is designed to ensure fast transportation and landing of troops and materiel to unprepared coast line; participation in SAR operations

The cargo can be delivered to poorly accessible areas of the coast.
Two-section bow ramp significantly simplifies the disembarkation of the military vehicles to the coast.
Air cavity cushion decreasing the water resistance is created by two centrifugal blowers with gears situated at the ship’s bottom.
Ventilated water-jets ensure high-speed and perfect maneuverability.

MPTU 14.5 mm shipborne pedestal machinegun.

Full displacement, t 305
Main dimensions (length, beam, draft), m 45x8,5x1,9
Maximum speed, kn 35
Range, miles до 500
Endurance, days 1
Seaworthiness, points 5
Cargo capacity, t 120

Video